Our target to having the wind turbine commissioned around December 1st. Soon this will be cranking out the juice. On Friday morning, the fog was blowing by. Here are a few shots.



This was the view from Dogbar Breakwater Saturday afternoon at 4:00.

Soon this turbine will be joined by two smaller turbines. The City of Gloucester is putting up two smaller turbines in the same industrial park. These are riding our our turbine’s coat tales. The city was able to leverage off of the 10 year wind studies that were done to for the the big turbine. That’s a good use of data.



4 comments:
Thats quite a sight indeed Steve.
Wow! I didn't realize how large it is until I saw it surrounded by everything.
Yeah, and we used to think that the blue water tower stuck out!
The second shot is my favourite, with the last shot pulling a close second! It will be interesting to see the three turbines all running!!