A lot of work has gone into the wind turbine here in Gloucester at the Varian Semiconductor Equipment site. Below is a list of my posts in chronological order of the construction.
- Day of arrival in Gloucester Harbor
- The barge with tower sections in the Inner Harbor
- The jobs site and a quick piece on Baldwin Cranes
- The nacelle staged on the job site
- Bringing a blade up to the job site
- Setting the first tower section
- Setting the second tower section
- Third tower section and crane preparations
- School visit, crane preparations
- The power lines, crane preparations
- 4th and 5th tower section lifts
- Preparing the nacelle for the big lift
- Lifting the nacelle and powertrain
- Assembling the first two blades
- Mounting the third blade
- Lifting the rotor
- Candid shots of the workers
As of today, there is still work to be done but most of it is inside the structure so no photo ops.




2 comments:
It has been a great story so far Steve.
Menudo trabajito...yo cuando las veía puestas nunca pensé en el trabajo que daban :-)...felicidades por las fotos y por el trabajo bien hecho...
Un tirón de orejas es lo que hay que darle por pintar el aspa :-)
Abrazotes y buen fin de semana
Noemí
Post a Comment